In the world of e-mobility, efficiency is key. That’s why we are pleased to present our latest 5th generation battery management system (BMS), which enables our customers to reduce development time by 50 %.

How does it work?

Optimized development time: Our BMS is deployed after the prototype and A-sample phase, allowing you to continue directly with the development of your B-sample. This leads to a significant reduction of development time.

Reliable system: It has already successfully completed basic validation and initial functional tests, including tests on hardware-in-the-loop (HiL). This enables us to guarantee maximum system robustness and reliability in operation.

Highest cost efficiency for series production (SOP): As an integrated solution, our BMS contains all the essential components for the vehicle system. This not only leads to savings in material and component costs, but also eliminates the need for additional components, further reducing complexity and costs.

With the 5th generation of our BMS, AVL Software and Functions offers a holistic and cost-efficient solution that significantly simplifies and accelerates the transition to series production.

Are you ready to take your project to the next level? Get started now: e-drive@avl.com